Week 63, Day 1

Week 63, Day 1:

  • The time-lapse camera has been playing up a bit recently and was offline for most of the day. It seems to behave itself after a reset – at least for a while – so it’s back online now but it missed the 14:00 snapshot and as a result the daily update didn’t auto-post. I manually uploaded the 10:00 photo instead.
  • There was some heavy rain today so the builders spent most of the day installing the new coving in the Living Room (which took a long time to arrive but finally got here the week before Christmas).
    • The main lighting in this room will be LED strips mounted above (to light the ceiling) and below (to light the walls)

Week 63, Day 1

New coving in Living Room

Cat #2 has worked out the Cat Flap

The younger, friendlier, confident cat (Thomas, the ginger and white one in a couple of the photos) worked out how to use the PetWalk cat flap on his first day in the house (albeit with a bit of encouragement and demonstration from me).

The older, deaf, timid one (Bob, plain black and camera shy) was blissfully unaware of of the presence of a portal to the outside world and has been using a litter tray in the Utility Room (where the cat flap is). When I’ve tried opening the cat flap for him, using the remote control, he’s run away.

I don’t know whether he saw the other cat using it or worked it out for himself, but yesterday I spotted him walk up to it, wait for it to open and hop outside as if he’d been doing it all his life.