Back to more normal weather – for a bit. The wall plates around the Garage are now installed, in readiness for the roof trusses, together with a bit more finishing off of the brickwork and blockwork around the Garage.
The scaffolders were back to install some scaffolding inside the Garage, to enable the internal walls to be built up to the ridge height of nearly 7 metres above internal floor level.
The installer for the doors and windows was also on-site to survey the finished door and window openings, in preparation for those being specified for manufacturing.