Week 28, Day 1

Week 28, Day 1:

  • Some rain showers through the day, hence the spots on the camera lens and applying the oil to the cedar boards had to move inside
  • More electrical first-fix
  • Installing the ALUTRIX membrane over the black primer on the underside of the roof, and priming the areas not done on Friday
Week 28, Day 1

Week 28, Day 1

Plenty of room to work indoors when it's raining

Plenty of room to work indoors when it’s raining

Power, data and a light switch at both sides of the bed in the Master Bedroom

Power, data and a light switch at both sides of the bed in the Master Bedroom

ALUTRIX 600 membrane on the store cupboard for Bedroom 5

ALUTRIX 600 membrane on the store cupboard for Bedroom 5

Successful AECB Site Visit

Ever since the build started the plan has been to host a visit for the nearest (Nottingham) AECB Local Group. The main challenge has been to gauge the “best” time, when much of the building had been completed to provide enough to look at but before some of the interesting (e.g. air tightness) details got covered up. Today seemed like about the right time, despite clashing with the International Passivhaus Conference.

We had a good turnout of about 20 people, some of whom joined us for an enjoyable chat about energy-efficient building over lunch beforehand. Thanks to Steve Yardley my Main Contractor for giving up his Sunday afternoon to answer lots of questions and to Gil Schalom for arranging the visit and for providing the photo below.

Some of the people at the AECB site visit

Some of the visitors at the AECB site visit

A further visit will be scheduled when the building is completed.