Week 25, Day 2

Week 25, Day 2:

  • The last (planned) day of the window and external door installation
  • The installation team will have to return to fit the glass to the big second-floor window (currently missing-in-action somewhere in Europe) and to replace the two windows that were the wrong colour
Week 25, Day 2

Week 25, Day 2

Internorm HS330 lift-and-slide door to first-floor balcony

Internorm HS330 lift-and-slide door to first-floor balcony

There’s deliberately a step-up to the door threshold since the balcony floor needs insulation and then needs to fall away to the outside to drain any water.

Internorm AT400 front door

Internorm AT400 front door

The red plastic tube is a temporary cover over the full-height stainless steel door handle.

No glass in the top-floor window on the west side

No glass in the top-floor window on the west side