Week 25, Day 2:
- The last (planned) day of the window and external door installation
- The installation team will have to return to fit the glass to the big second-floor window (currently missing-in-action somewhere in Europe) and to replace the two windows that were the wrong colour
There’s deliberately a step-up to the door threshold since the balcony floor needs insulation and then needs to fall away to the outside to drain any water.
The red plastic tube is a temporary cover over the full-height stainless steel door handle.