Routing some of the semi-rigid ventilation ducts for the MVHR system, relatively easy using the plastic ducts and with the Easi-Joists but still something of a challenge in the more congested areas
Week 31, Day 2
All the ventilation ducts need to pass through the Second Bedroom ceiling
Some of the rooms require twin ducts to carry the required flow rate